2017</span> Bell <span>429

2017 Bell 429

S/N: 57326 | PK-WSJ

Make offer
Sold

Total Hours
682 hours since new

Engines
                  

  TSN S/N
#1 682:10 PCE-BL0665
#2 682:10 PCE-BL0664

Highlights

  • Very Low hours 682 Hrs
  • Engines are on ESP Gold Program
  • Air Conditioning
  • 4 Axis Auto Pilot
  • Floats and life raft FP & RP (not installed)

Download Full Specs

Details

STANDARD FACTORY EQUIPMENT

  • Air conditioner drive quill
  • Air conditioner provisions (Air Comm)
  • Electrical Provisions Kit (required for Cat. A Operations)
  • Emergency locator transmitter (ELT) – C406 NHM (Artex)
  • Inlet Barrier Filter Electrical Provisions
  • NAV/COM/GPS GTN 750/650 (Garmin)
  • Rotor Brake Provisions
  • Wire strike protection system (Lower Provisions)
  • Wire strike protection system (Upper Provisions)

INTERIOR

  • Corporate Interior – Dual Pilot
  • Corporate interior trim
  • Plush wool carpets (for use with dual pilot controls)
  • Door openers – Automatic – for crew (2 door kit) (AA)
  • Headliner – Corporate with LED lights & Adjustable AC Vents & color Coordinated leather Trim
  • Seats- Passenger corporate 6 Place club 18.5’ seats with 3 point restraint system quick release disconnects & ICS Fixed provisions
  • Sound proofing cabin

AVIONICS

  • Garmin GTN 650 VHF Comm/Nav/GPS
  • Garmin GTN 750 VHF Comm/Nav/GPS
  • Garmin GTX 33H Remote Transponder
  • Honeywell KRA-405B Radio Altimeter
  • Avidyne TAS600 TCAS Computer
  • Garmin GSR 56H Satellite Communication System (EASA Approved)
  • Honeywell KDM706A DME
  • Artex C406-2HM ELT
  • Honeywell KSG 7200 ADHRS Unit (x2)

ADDITIONAL EQUIPMENT

  • 200 Amp starter generator (Dual) required for Cat. A Operations)
  • 4-Axis Autopilot
  • Aft bulkhead closeout panel
  • Aft ICS – 6 place (Headsets not included)
  • Air conditioner with Single evaporator and manual controls (Air Comm)
  • Articulated landing light (required for Cat. A Operations)
  • Bleed Air Heater Equipment (Air Comm)
  • Bleed Air Heater Provisions (Air Comm)
  • Cockpit Voice recorder/Flight data recorder
  • Compressor wash kit
  • Dual Pilot control provisions
  • Dual pilot control equipment (required for Dual pilot operation)
  • Does not include co -pilot headset.
  • Forward flashing light
  • Door openers- Automatic – for passengers (2 door kit) (AA)
  • GPS GTN 750 HTAWS Upgrade
  • Increased Capacity Battery (53 Amph) (Cat. A Com- pliant)
  • Rear Clamshell Doors with windows
  • Rotor Brake Equipment
  • Emergency floats package (Provisions & Equipment)- Life Raft RH float
  • Emergency floats provisions (Electrical & fixed) for floats with life rafts
  • Emergency floats with one life raft – right side (Aerazur) life vests not included)
  • January 2018 -Installation of locking fuel cap (FAA STC)
Contact us